Triple

T11866932
Position Surface form Disambiguated ID Type / Status
Subject Bonneville Project Act of 1937 E282307 entity
Predicate relatedToProject P58621 FINISHED
Object Columbia River hydropower system E78455 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Columbia River hydropower system | Statement: [Bonneville Project Act of 1937, relatedToProject, Columbia River hydropower system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Columbia River hydropower system
Context triple: [Bonneville Project Act of 1937, relatedToProject, Columbia River hydropower system]
  • A. Columbia River hydropower system chosen
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • B. Snake River hydropower system
    The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
  • C. Skagit River Hydroelectric Project
    The Skagit River Hydroelectric Project is a major hydroelectric power system in Washington State that supplies electricity to the Seattle area through a series of dams and reservoirs on the Skagit River.
  • D. Columbia–Snake River lock system
    The Columbia–Snake River lock system is a series of navigation locks and dams on the Columbia and Snake Rivers that enables barge traffic deep into the interior Pacific Northwest, supporting regional commerce, irrigation, and hydropower generation.
  • E. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2945d081908a5851c916cbcfb5 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8a73a233081909449ab294d01a512 completed April 10, 2026, 7:31 a.m.
NED1 Entity disambiguation (via context triple) batch_69f417bb131c8190b0923e077cca74be completed May 1, 2026, 3:02 a.m.
Created at: April 8, 2026, 9:43 p.m.