Triple

T11866858
Position Surface form Disambiguated ID Type / Status
Subject Bonneville Power Administration E282305 entity
Predicate gridInterconnection P24733 FINISHED
Object Western Interconnection power grid E284822 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Western Interconnection power grid | Statement: [Bonneville Power Administration, gridInterconnection, Western Interconnection power grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Western Interconnection power grid
Context triple: [Bonneville Power Administration, gridInterconnection, Western Interconnection power grid]
  • A. North American power transmission grid
    The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
  • B. Western Interconnection chosen
    The Western Interconnection is a major synchronized electric power grid that spans much of western North America, linking utilities and power plants across multiple U.S. states, Canadian provinces, and parts of Mexico.
  • C. Eastern Interconnection
    The Eastern Interconnection is one of North America's major synchronized AC power grids, spanning much of the eastern and central United States and parts of Canada.
  • D. Midcontinent Independent System Operator region
    The Midcontinent Independent System Operator region is a large North American electric transmission and wholesale power market area coordinated by MISO, spanning multiple U.S. states and parts of Canada to ensure reliable, efficient grid operations.
  • E. Ontario electricity grid
    The Ontario electricity grid is the province-wide interconnected network of power generation, transmission, and distribution infrastructure that delivers electricity to homes, businesses, and industries across Ontario, Canada.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2945d081908a5851c916cbcfb5 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8a73a233081909449ab294d01a512 completed April 10, 2026, 7:31 a.m.
NED1 Entity disambiguation (via context triple) batch_69f2819229ec81908a3bc5579d661c20 completed April 29, 2026, 10:09 p.m.
Created at: April 8, 2026, 9:43 p.m.