Triple

T11866826
Position Surface form Disambiguated ID Type / Status
Subject Bonneville Power Administration E282305 entity
Predicate mainPowerSource P8164 FINISHED
Object Columbia River hydroelectric dams E78455 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Columbia River hydroelectric dams | Statement: [Bonneville Power Administration, mainPowerSource, Columbia River hydroelectric dams]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Columbia River hydroelectric dams
Context triple: [Bonneville Power Administration, mainPowerSource, Columbia River hydroelectric dams]
  • A. Columbia River hydropower system chosen
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • B. Grand Coulee Dam
    Grand Coulee Dam is a massive concrete gravity dam on the Columbia River in Washington State, renowned as one of the largest power-producing facilities in the United States and a landmark of New Deal–era infrastructure.
  • C. Coulee Dam, Washington
    Coulee Dam, Washington is a small town in north-central Washington State best known as the community adjacent to the massive Grand Coulee Dam on the Columbia River.
  • D. Skagit River Hydroelectric Project
    The Skagit River Hydroelectric Project is a major hydroelectric power system in Washington State that supplies electricity to the Seattle area through a series of dams and reservoirs on the Skagit River.
  • E. Snake River hydropower system
    The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mainPowerSource
Context triple: [Bonneville Power Administration, mainPowerSource, Columbia River hydroelectric dams]
  • A. hasPowerSource chosen
    Indicates that an entity derives its operational energy or functionality from a specified power source.
  • B. mainCentralPower
    Indicates that an entity functions as the primary central authority or dominant power within a given system or context.
  • C. suppliesPowerTo
    Indicates that one entity provides electrical or energy power required for the operation or functioning of another entity.
  • D. electricalPower
    Indicates that one entity supplies, carries, or is associated with electrical power to or for another entity.
  • E. hasPowerSupplyType
    Indicates that an entity is associated with a specific type or category of power supply it uses or requires.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2945d081908a5851c916cbcfb5 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8a73a233081909449ab294d01a512 completed April 10, 2026, 7:31 a.m.
NED1 Entity disambiguation (via context triple) batch_69f2819229ec81908a3bc5579d661c20 completed April 29, 2026, 10:09 p.m.
PD Predicate disambiguation batch_69d8a2589f0c8190ad82ff11acabae93 completed April 10, 2026, 7:10 a.m.
Created at: April 8, 2026, 9:43 p.m.