Triple

T11866812
Position Surface form Disambiguated ID Type / Status
Subject Bonneville Power Administration E282305 entity
Predicate instanceOf P0 FINISHED
Object power marketing administration C359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: power marketing administration
Context triple: [Bonneville Power Administration, instanceOf, power marketing administration]
  • A. power system
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • B. electric utility chosen
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • C. wholesale electricity market operator
    A wholesale electricity market operator is an entity that administers and coordinates the buying and selling of electricity in bulk, ensuring efficient market functioning, system reliability, and fair access for generators and large consumers.
  • D. power exchange
    Power exchange is a consensual dynamic in which individuals negotiate and enact the giving and receiving of authority, control, or influence within a relationship or interaction.
  • E. energy ministry
    The energy ministry is a government department responsible for formulating and implementing national policies, regulations, and strategies related to energy production, distribution, conservation, and security.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2945d081908a5851c916cbcfb5 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:43 p.m.