Triple

T11828332
Position Surface form Disambiguated ID Type / Status
Subject Betty Go-Belmonte station E281314 entity
Predicate servesCommutersAlong P95592 FINISHED
Object Manila's LRT Line 2 E951819 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Manila's LRT Line 2 | Statement: [Betty Go-Belmonte station, servesCommutersAlong, Manila's LRT Line 2]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Manila's LRT Line 2
Context triple: [Betty Go-Belmonte station, servesCommutersAlong, Manila's LRT Line 2]
  • A. Manila LRT Line 2 chosen
    Manila LRT Line 2 is an elevated rapid transit line in Metro Manila that runs east–west across the city, connecting key residential, commercial, and educational districts.
  • B. Manila Light Rail Transit System
    The Manila Light Rail Transit System is an urban rapid transit network in Metro Manila, Philippines, providing high-capacity rail services along key commuter corridors.
  • C. Manila Metro Rail Transit System
    The Manila Metro Rail Transit System is a rapid transit network in Metro Manila, Philippines, providing elevated urban rail services along some of the city's busiest corridors.
  • D. MRT-7 Quezon City–San Jose del Monte line
    The MRT-7 Quezon City–San Jose del Monte line is a mass rapid transit railway under development in the Philippines that will connect Quezon City in Metro Manila to San Jose del Monte in Bulacan to ease traffic congestion and improve regional mobility.
  • E. Metro Cebu
    Metro Cebu is the main metropolitan area of Cebu in the Philippines, encompassing Cebu City and its surrounding cities and municipalities as a major economic, cultural, and transportation hub in the Visayas region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: servesCommutersAlong
Context triple: [Betty Go-Belmonte station, servesCommutersAlong, Manila's LRT Line 2]
  • A. operatesCommuterServiceBetween
    Indicates that an entity runs a commuter transportation service connecting two specified locations.
  • B. servesCommuterRailLine chosen
    Indicates that a location or facility provides access to and is a stop or station for a commuter rail line.
  • C. transportationServedBy
    Indicates that a transportation facility, route, or area is provided service or coverage by a specific transportation provider or mode.
  • D. commuterHubFor
    Indicates a location that serves as a primary transit or gathering point for commuters traveling to or from another place.
  • E. commutesBetween
    Indicates a regular pattern of travel back and forth between two locations, typically for work, study, or routine activities.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab276f8c8190b1966a0ef11349ac completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8a5ec3a148190bb184ba0d481b16a completed April 10, 2026, 7:25 a.m.
NED1 Entity disambiguation (via context triple) batch_69f6e2527570819092314ee0a678e53c completed May 3, 2026, 5:51 a.m.
PD Predicate disambiguation batch_69d8a251fc08819095933f1d13c3b742 completed April 10, 2026, 7:10 a.m.
Created at: April 8, 2026, 9:43 p.m.