Triple

T1181382
Position Surface form Disambiguated ID Type / Status
Subject Titan IIIE E25143 entity
Predicate failureDetail P21234 FINISHED
Object one launch failed due to Centaur upper stage issue LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: one launch failed due to Centaur upper stage issue | Statement: [Titan IIIE, failureDetail, one launch failed due to Centaur upper stage issue]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: failureDetail
Context triple: [Titan IIIE, failureDetail, one launch failed due to Centaur upper stage issue]
  • A. missionFailure
    Indicates that an attempted mission or operation did not achieve its intended objectives or outcome.
  • B. fault
    Indicates that one entity is responsible or at blame for a problem, error, or undesirable outcome involving another entity or situation.
  • C. failureCauseOnFirstFlight chosen
    Indicates that an entity’s first flight resulted in a failure and specifies the cause of that failure.
  • D. typeOfFaulting
    Indicates the kind or classification of geological faulting that characterizes the relationship between rock units or structures.
  • E. failsWhen
    Indicates that a particular action, process, or condition does not succeed under the specified circumstances or triggers.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a494267b4c819088c97a59182bf56a completed March 1, 2026, 7:31 p.m.
NER Named-entity recognition batch_69a4bd347d4481909e9094463011289d completed March 1, 2026, 10:27 p.m.
PD Predicate disambiguation batch_69a4bb59ca6c81908597a81646674aaa completed March 1, 2026, 10:19 p.m.
Created at: March 1, 2026, 7:45 p.m.