Triple

T11798597
Position Surface form Disambiguated ID Type / Status
Subject UTDC ICTS Mark I E280566 entity
Predicate instanceOf P0 FINISHED
Object automated guided transit vehicle C8949 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: automated guided transit vehicle
Context triple: [UTDC ICTS Mark I, instanceOf, automated guided transit vehicle]
  • A. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • B. automated people mover vehicle chosen
    An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
  • C. rapid transit vehicle
    A rapid transit vehicle is a high-capacity, electrically powered rail car or train designed to provide frequent, fast, and reliable urban or suburban passenger transportation on dedicated or grade-separated tracks.
  • D. rubber-tired transit system
    A rubber-tired transit system is a guided public transportation mode in which vehicles run on rubber tires along a dedicated roadway or track, often combining bus-like flexibility with rail-like guidance and capacity.
  • E. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:42 p.m.