Triple

T11798522
Position Surface form Disambiguated ID Type / Status
Subject Bombardier ART Mark II E280564 entity
Predicate instanceOf P0 FINISHED
Object automated rapid transit vehicle C9594 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: automated rapid transit vehicle
Context triple: [Bombardier ART Mark II, instanceOf, automated rapid transit vehicle]
  • A. rapid transit vehicle chosen
    A rapid transit vehicle is a high-capacity, electrically powered rail car or train designed to provide frequent, fast, and reliable urban or suburban passenger transportation on dedicated or grade-separated tracks.
  • B. light rail vehicle
    A light rail vehicle is a rail-based transit vehicle designed for urban and suburban passenger service, typically operating on dedicated or shared tracks with frequent stops and moderate capacity.
  • C. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • D. rubber-tired transit system
    A rubber-tired transit system is a guided public transportation mode in which vehicles run on rubber tires along a dedicated roadway or track, often combining bus-like flexibility with rail-like guidance and capacity.
  • E. rail vehicle
    A rail vehicle is a wheeled conveyance designed to operate on railway tracks for transporting passengers, freight, or performing specialized rail-related tasks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:42 p.m.