Triple
T11798312
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ICTS |
E280559
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | medium-capacity rail transport system |
C5215
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: medium-capacity rail transport system Context triple: [ICTS, instanceOf, medium-capacity rail transport system]
-
A.
suburban commuter train
A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
-
B.
rapid transit vehicle
A rapid transit vehicle is a high-capacity, electrically powered rail car or train designed to provide frequent, fast, and reliable urban or suburban passenger transportation on dedicated or grade-separated tracks.
-
C.
light rail transit line
chosen
A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
-
D.
rapid transit line
A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
-
E.
rapid rail system
A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab258b808190b1735835c841e3a4 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:42 p.m.