Triple

T11797853
Position Surface form Disambiguated ID Type / Status
Subject Grey Cup Festival E280544 entity
Predicate endTime P214 FINISHED
Object Grey Cup game day NE GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Grey Cup game day
Context triple: [Grey Cup Festival, endTime, Grey Cup game day]
  • A. Grey Cup Festival
    The Grey Cup Festival is a multi-day celebration featuring concerts, fan events, and cultural activities held in the host city leading up to the Canadian Football League’s Grey Cup championship game.
  • B. Grey Cup chosen
    The Grey Cup is the championship trophy awarded annually to the winner of the Canadian Football League, serving as the centerpiece of Canadian professional football.
  • C. CFL Labour Day Classic
    The CFL Labour Day Classic is an annual Canadian Football League rivalry game traditionally played on Labour Day weekend, featuring marquee matchups such as the Hamilton Tiger-Cats against their closest geographic rivals.
  • D. Telus Cup
    The Telus Cup is Canada's national midget ice hockey championship, showcasing the country's top under-18 teams in an annual tournament.
  • E. Uteck Bowl
    The Uteck Bowl is one of Canadian university football’s national semifinal games, determining a finalist for the Vanier Cup championship.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab258b808190b1735835c841e3a4 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:42 p.m.