Triple
T11753349
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cavatina |
E279461
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | slow movement |
C29763
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: slow movement Context triple: [Cavatina, instanceOf, slow movement]
-
A.
fast
Fast is a conceptual class representing entities or processes characterized by high speed, quick response, or rapid change relative to a given context or standard.
-
B.
critical movement
A critical movement is a coordinated social, political, or artistic effort that challenges and seeks to transform dominant structures, norms, or power relations through critique and collective action.
-
C.
mass movement
Mass movement is the downslope transport of soil, rock, and debris under the direct influence of gravity, often occurring rapidly and sometimes catastrophically.
-
D.
forced march
A forced march is a rapid, prolonged movement of troops or people over long distances under strict orders, often with minimal rest and supplies, typically used in military operations or coercive relocations.
-
E.
fast day
A fast day is a designated period, often in religious or spiritual traditions, during which individuals abstain from some or all food and sometimes drink for purposes such as devotion, repentance, or reflection.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab01038c819080714901502c84fc |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:41 p.m.