Triple

T11749943
Position Surface form Disambiguated ID Type / Status
Subject First Five-Year Plan of the People's Republic of China E279378 entity
Predicate instanceOf P0 FINISHED
Object five-year plan C11101 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: five-year plan
Context triple: [First Five-Year Plan of the People's Republic of China, instanceOf, five-year plan]
  • A. long-term plan
    A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
  • B. plan chosen
    A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
  • C. centralized economic planning system
    A centralized economic planning system is a structure in which a central authority makes decisions about the allocation of resources, production targets, and distribution of goods and services across an economy.
  • D. federal capital plan
    A federal capital plan is a strategic, long-term framework that outlines the government’s priorities, timing, and funding for investments in major physical and technological assets to support national policy goals and public services.
  • E. Five K
    A Five K is a long-distance running event covering five kilometers, typically organized as a race or fun run for participants of varying skill levels.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab01038c819080714901502c84fc completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:41 p.m.