Triple

T11741809
Position Surface form Disambiguated ID Type / Status
Subject 桂川 E279172 entity
Predicate 関連鉄道路線 P848 FINISHED
Object 阪急嵐山線 E326211 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 阪急嵐山線 | Statement: [桂川, 関連鉄道路線, 阪急嵐山線]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 阪急嵐山線
Context triple: [桂川, 関連鉄道路線, 阪急嵐山線]
  • A. 京阪本線
    京阪本線は、大阪と京都を結び京阪電気鉄道の主要幹線として都市間輸送や通勤・通学需要を担う鉄道路線です。
  • B. Hankyu Arashiyama Line chosen
    The Hankyu Arashiyama Line is a short railway line in Kyoto, Japan, operated by Hankyu Railway, primarily serving tourists and locals traveling to the scenic Arashiyama area.
  • C. 京阪交野線
    京阪交野線は、大阪府枚方市と交野市を結び、京阪本線と接続する京阪電気鉄道の支線的な役割を持つ鉄道路線である。
  • D. Hankyu Kyoto Main Line
    The Hankyu Kyoto Main Line is a major private railway line in Japan operated by Hankyu Railway, connecting Osaka and Kyoto through several suburban cities.
  • E. Kintetsu Kyoto Line
    The Kintetsu Kyoto Line is a major private railway line in Japan connecting Kyoto with Nara and other destinations in the Kansai region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab01038c819080714901502c84fc completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a4f191388190bd6ef7e80c41ca48 completed April 10, 2026, 7:21 a.m.
NED1 Entity disambiguation (via context triple) batch_69f019d331888190866bdd04f6c73e08 completed April 28, 2026, 2:22 a.m.
Created at: April 8, 2026, 9:41 p.m.