Triple

T11738286
Position Surface form Disambiguated ID Type / Status
Subject Highway 403 bridge over Credit River E279086 entity
Predicate instanceOf P0 FINISHED
Object highway bridge C958 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaffec6881908bead509e8621742 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:41 p.m.