Triple
T11722098
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Great Roof |
E278661
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rock climbing pitch |
C6570
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rock climbing pitch Context triple: [Great Roof, instanceOf, rock climbing pitch]
-
A.
rock climbing route
A rock climbing route is a predefined path on a rock face or climbing wall, marked or understood by specific holds and movements, that climbers follow from start to finish at a given difficulty.
-
B.
ice climbing route
An ice climbing route is a designated path up a frozen surface, such as an icefall or glacier, characterized by its difficulty, length, and required protection and techniques.
-
C.
multi-pitch climbing route
chosen
A multi-pitch climbing route is a long rock climb divided into several sequential rope-length sections (pitches), each ending at a belay station where climbers regroup before continuing upward.
-
D.
rock climbing area
A rock climbing area is a designated natural or artificial location equipped with routes and features suitable for climbing activities.
-
E.
ridge climb route
A ridge climb route is a designated path that follows the crest or spine of a mountain ridge, typically involving sustained exposure and mixed climbing terrain.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaff2ce88190b4a1e4b341ad5377 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:40 p.m.