Triple
T11707881
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Spanish Road |
E278294
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | strategic overland corridor |
C2952
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: strategic overland corridor Context triple: [Spanish Road, instanceOf, strategic overland corridor]
-
A.
Indigenous travel corridor
An Indigenous travel corridor is a traditional route or network of pathways used by Indigenous peoples for movement, trade, cultural exchange, and connection across their ancestral lands.
-
B.
transport corridor
chosen
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
C.
road transportation corridor
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
D.
transcontinental automobile route
A transcontinental automobile route is a long-distance roadway or network of connected highways that enables continuous vehicular travel across an entire continent from one coast or border to another.
-
E.
overland expedition
An overland expedition is a long-distance journey across remote or challenging terrain, typically using rugged vehicles or pack animals, focused on exploration, self-sufficiency, and adventure rather than speed or directness of route.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaff2ce88190b4a1e4b341ad5377 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:40 p.m.