Triple

T11698700
Position Surface form Disambiguated ID Type / Status
Subject Chicago South Shore and South Bend Railroad E278064 entity
Predicate instanceOf P0 FINISHED
Object interurban electric railroad C17649 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interurban electric railroad
Context triple: [Chicago South Shore and South Bend Railroad, instanceOf, interurban electric railroad]
  • A. interurban railroad chosen
    An interurban railroad is an electric railway system that provides passenger and sometimes freight service between cities and towns, typically operating on dedicated tracks or street-running routes over medium distances.
  • B. suburban commuter train
    A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
  • C. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • D. commuter rail line
    A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
  • E. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafe02d881909900d54ad7d4af84 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:40 p.m.