Triple

T11693076
Position Surface form Disambiguated ID Type / Status
Subject ITS (Interplanetary Transport System) E277917 entity
Predicate instanceOf P0 FINISHED
Object interplanetary spacecraft system concept C1126 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: interplanetary spacecraft system concept
Context triple: [ITS (Interplanetary Transport System), instanceOf, interplanetary spacecraft system concept]
  • A. interplanetary space mission
    An interplanetary space mission is a coordinated endeavor that sends spacecraft from one planet to another to conduct scientific research, exploration, or technology demonstration beyond Earth's immediate environment.
  • B. interstellar spacecraft design study
    A conceptual analysis and planning effort that explores, evaluates, and defines the technologies, configurations, and mission architectures required for a feasible interstellar spacecraft.
  • C. spacecraft
    A spacecraft is a vehicle or device designed to travel beyond Earth's atmosphere for purposes such as exploration, communication, research, or transportation.
  • D. spacecraft propulsion concept
    A spacecraft propulsion concept is a theoretical or practical method for generating thrust to maneuver a spacecraft in space, encompassing the underlying physics, required systems, and performance characteristics.
  • E. space transportation system chosen
    A space transportation system is an integrated set of vehicles, infrastructure, and operations designed to move payloads and passengers between Earth and space or between locations in space.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafe02d881909900d54ad7d4af84 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:40 p.m.