Triple
T11693075
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ITS (Interplanetary Transport System) |
E277917
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | super heavy-lift launch system concept |
C2828
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: super heavy-lift launch system concept Context triple: [ITS (Interplanetary Transport System), instanceOf, super heavy-lift launch system concept]
-
A.
super heavy-lift launch vehicle
chosen
A super heavy-lift launch vehicle is a powerful rocket system designed to carry extremely large payloads—such as crewed spacecraft, space station modules, or deep-space missions—into Earth orbit or beyond in a single launch.
-
B.
heavy-lift launch vehicle
A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
-
C.
fully reusable launch system
A fully reusable launch system is a space launch architecture in which all major components (such as boosters, upper stages, and spacecraft) are recovered, refurbished, and flown again, minimizing expendable hardware and reducing per-launch costs.
-
D.
orbital launch vehicle
An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
-
E.
vertical launch system
A vertical launch system is a ship- or land-based arrangement of vertical cells that store, protect, and rapidly fire missiles straight up before they pitch toward their targets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aafe02d881909900d54ad7d4af84 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:40 p.m.