Triple

T11693075
Position Surface form Disambiguated ID Type / Status
Subject ITS (Interplanetary Transport System) E277917 entity
Predicate instanceOf P0 FINISHED
Object super heavy-lift launch system concept C2828 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: super heavy-lift launch system concept
Context triple: [ITS (Interplanetary Transport System), instanceOf, super heavy-lift launch system concept]
  • A. super heavy-lift launch vehicle chosen
    A super heavy-lift launch vehicle is a powerful rocket system designed to carry extremely large payloads—such as crewed spacecraft, space station modules, or deep-space missions—into Earth orbit or beyond in a single launch.
  • B. heavy-lift launch vehicle
    A heavy-lift launch vehicle is a powerful rocket system designed to carry large payloads—such as satellites, space station modules, or deep-space missions—into orbit or beyond.
  • C. fully reusable launch system
    A fully reusable launch system is a space launch architecture in which all major components (such as boosters, upper stages, and spacecraft) are recovered, refurbished, and flown again, minimizing expendable hardware and reducing per-launch costs.
  • D. orbital launch vehicle
    An orbital launch vehicle is a rocket-powered system designed to transport payloads from Earth's surface into orbit by achieving sufficient velocity and altitude to remain in continuous free-fall around the planet.
  • E. vertical launch system
    A vertical launch system is a ship- or land-based arrangement of vertical cells that store, protect, and rapidly fire missiles straight up before they pitch toward their targets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafe02d881909900d54ad7d4af84 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:40 p.m.