Triple
T11689021
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Technological Institute of Mexico |
E277819
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | engineering school network |
C16151
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: engineering school network Context triple: [National Technological Institute of Mexico, instanceOf, engineering school network]
-
A.
engineering institute
An engineering institute is an educational and research organization dedicated to teaching, advancing, and applying engineering principles and technologies across various specialized fields.
-
B.
school network
A school network is a connected system of schools, resources, and stakeholders that collaborates to share information, coordinate activities, and support educational goals across multiple institutions.
-
C.
network of universities
chosen
A network of universities is an interconnected system of higher education institutions that collaborate to share resources, research, programs, and expertise across organizational and geographic boundaries.
-
D.
polytechnic
A polytechnic is an educational institution focused on providing practical, career-oriented training and applied research in technical, engineering, and vocational fields.
-
E.
public school
A public school is a government-funded educational institution that provides free, standardized instruction to students within a designated community or district.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aafe02d881909900d54ad7d4af84 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:40 p.m.