Triple

T11677934
Position Surface form Disambiguated ID Type / Status
Subject Seattle City Light E277539 entity
Predicate hasFacility P105 FINISHED
Object Ross Dam E952636 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ross Dam | Statement: [Seattle City Light, hasFacility, Ross Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ross Dam
Context triple: [Seattle City Light, hasFacility, Ross Dam]
  • A. Ross Dam chosen
    Ross Dam is a large hydroelectric dam in Washington State that forms Ross Lake as part of the Skagit River Hydroelectric Project.
  • B. Cascade Dam
    Cascade Dam is a hydroelectric and flood-control structure located on the Thornapple River in Michigan.
  • C. O'Shaughnessy Dam
    O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
  • D. Forge Dam
    Forge Dam is a popular recreational park and former industrial mill site along Porter Brook in Sheffield, England, known for its woodland walks, playground, and café.
  • E. Kerr Dam
    Kerr Dam is a large hydroelectric and flood-control structure on the Roanoke River that creates Kerr Lake (also known as Buggs Island Lake) along the Virginia–North Carolina border.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafd0a448190b44da30af8c6c519 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a46000a48190888ad1a6ade052e3 completed April 10, 2026, 7:18 a.m.
NED1 Entity disambiguation (via context triple) batch_69f6a52daf1c81909c586e470a998073 completed May 3, 2026, 1:30 a.m.
Created at: April 8, 2026, 9:40 p.m.