Triple

T11672204
Position Surface form Disambiguated ID Type / Status
Subject Zhuyin E277409 entity
Predicate instanceOf P0 FINISHED
Object Chinese phonetic notation system C29663 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chinese phonetic notation system
Context triple: [Zhuyin, instanceOf, Chinese phonetic notation system]
  • A. romanization scheme
    A romanization scheme is a systematic method for representing the sounds or characters of a non-Latin writing system using the Latin alphabet.
  • B. phonological system
    A phonological system is the organized set of sounds and sound patterns in a language, along with the rules governing their combination and pronunciation.
  • C. Sinitic language
    A Sinitic language is any member of the Chinese branch of the Sino-Tibetan language family, characterized by tonal phonology, analytic grammar, and a shared historical connection to Classical Chinese.
  • D. Hmong romanization system
    A Hmong romanization system is a standardized method of writing the Hmong language using the Latin alphabet, encoding its tones, consonants, and vowels for consistent reading and writing.
  • E. Osage-language writing system
    The Osage-language writing system is a modern, standardized orthography, including a unique alphabet, designed specifically to represent the sounds and structure of the Osage language accurately and support its revitalization.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafd0a448190b44da30af8c6c519 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:40 p.m.