Triple

T11670799
Position Surface form Disambiguated ID Type / Status
Subject Croome River (engineered watercourse) E277372 entity
Predicate instanceOf P0 FINISHED
Object ornamental watercourse C23857 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ornamental watercourse
Context triple: [Croome River (engineered watercourse), instanceOf, ornamental watercourse]
  • A. urban watercourse
    An urban watercourse is a natural or engineered channel of flowing water that runs through a city or town, shaped and managed by surrounding urban infrastructure and land use.
  • B. engineered waterway
    An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
  • C. seasonal watercourse
    A seasonal watercourse is a natural channel that carries flowing water only during certain times of the year, typically in response to precipitation or snowmelt, and remains dry or with minimal flow for the rest of the year.
  • D. baroque waterway chosen
    A baroque waterway is an ornately designed canal or watercourse, often integrated into grand landscapes or urban plans, characterized by elaborate curves, decorative features, and dramatic visual perspectives typical of the Baroque style.
  • E. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafd0a448190b44da30af8c6c519 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:39 p.m.