Triple

T1164368
Position Surface form Disambiguated ID Type / Status
Subject Carson River E24566 entity
Predicate hasManagementPlan P8851 FINISHED
Object Carson River Watershed Adaptive Stewardship Plan
The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
E133551 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carson River Watershed Adaptive Stewardship Plan | Statement: [Carson River, hasManagementPlan, Carson River Watershed Adaptive Stewardship Plan]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Carson River Watershed Adaptive Stewardship Plan
Context triple: [Carson River, hasManagementPlan, Carson River Watershed Adaptive Stewardship Plan]
  • A. Bay-Delta Conservation Plan
    The Bay-Delta Conservation Plan is a large-scale habitat conservation and water management initiative aimed at restoring ecological health and improving water supply reliability in California’s Sacramento–San Joaquin River Delta.
  • B. San Joaquin River Restoration Program
    The San Joaquin River Restoration Program is a long-term environmental initiative aimed at restoring flows, fish populations, and ecosystem health to California’s San Joaquin River while maintaining water supply reliability for agriculture and communities.
  • C. Truckee River Operating Agreement
    The Truckee River Operating Agreement is a comprehensive water management pact that allocates and coordinates the use of Truckee River water among California, Nevada, tribal nations, and federal interests to balance municipal, agricultural, environmental, and recreational needs.
  • D. Comprehensive Everglades Restoration Plan
    The Comprehensive Everglades Restoration Plan is a large-scale, long-term federal–state initiative aimed at restoring the natural hydrology, water quality, and ecosystems of the Florida Everglades while supporting regional water needs.
  • E. Salton Sea Restoration Program
    The Salton Sea Restoration Program is a long-term environmental initiative aimed at addressing ecological degradation, public health risks, and habitat loss at California’s Salton Sea through water management, habitat creation, and dust control projects.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Carson River Watershed Adaptive Stewardship Plan
Triple: [Carson River, hasManagementPlan, Carson River Watershed Adaptive Stewardship Plan]
Generated description
The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Carson River Watershed Adaptive Stewardship Plan
Target entity description: The Carson River Watershed Adaptive Stewardship Plan is a comprehensive, long-term strategy guiding collaborative, science-based management and restoration of the Carson River watershed’s natural resources and water quality.
  • A. Bay-Delta Conservation Plan
    The Bay-Delta Conservation Plan is a large-scale habitat conservation and water management initiative aimed at restoring ecological health and improving water supply reliability in California’s Sacramento–San Joaquin River Delta.
  • B. San Joaquin River Restoration Program
    The San Joaquin River Restoration Program is a long-term environmental initiative aimed at restoring flows, fish populations, and ecosystem health to California’s San Joaquin River while maintaining water supply reliability for agriculture and communities.
  • C. Truckee River Operating Agreement
    The Truckee River Operating Agreement is a comprehensive water management pact that allocates and coordinates the use of Truckee River water among California, Nevada, tribal nations, and federal interests to balance municipal, agricultural, environmental, and recreational needs.
  • D. Comprehensive Everglades Restoration Plan
    The Comprehensive Everglades Restoration Plan is a large-scale, long-term federal–state initiative aimed at restoring the natural hydrology, water quality, and ecosystems of the Florida Everglades while supporting regional water needs.
  • E. Salton Sea Restoration Program
    The Salton Sea Restoration Program is a long-term environmental initiative aimed at addressing ecological degradation, public health risks, and habitat loss at California’s Salton Sea through water management, habitat creation, and dust control projects.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a494060e148190abb42f971242c197 completed March 1, 2026, 7:31 p.m.
NER Named-entity recognition batch_69a4bccb3b388190938c68dee90b3f19 completed March 1, 2026, 10:25 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac66803e0881908d2eea76dad028fa completed March 7, 2026, 5:55 p.m.
NEDg Description generation batch_69ac670b57808190bee4aa0be78ae8a1 completed March 7, 2026, 5:57 p.m.
NED2 Entity disambiguation (via description) batch_69ac67e981e88190b10ad4ab72337557 completed March 7, 2026, 6:01 p.m.
Created at: March 1, 2026, 7:45 p.m.