Triple
T11641690
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Titan II ICBM |
E276674
|
entity |
| Predicate | usedAsLaunchVehicleFor |
P4020
|
FINISHED |
| Object | Gemini 12 |
E81511
|
NE FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Gemini 12 Context triple: [Titan II ICBM, usedAsLaunchVehicleFor, Gemini 12]
-
A.
Gemini 12
chosen
Gemini 12 was the final crewed mission of NASA’s Gemini program, notable for successfully advancing spacewalk techniques and rendezvous/docking procedures that paved the way for Apollo lunar missions.
-
B.
Gemini 10
Gemini 10 was a 1966 NASA crewed spaceflight in the Gemini program that conducted rendezvous, docking, and spacewalk experiments as a precursor to the Apollo lunar missions.
-
C.
Apollo 12
Apollo 12 was NASA’s second crewed mission to land humans on the Moon, notable for its precise landing near the Surveyor 3 probe in November 1969.
-
D.
Apollo 10
Apollo 10 was a 1969 NASA mission that served as a full dress rehearsal for the first Moon landing, testing all lunar operations except the actual touchdown.
-
E.
Apollo 14
Apollo 14 was NASA’s 1971 crewed mission that successfully returned astronauts to the Moon, notable for precision lunar landing and extensive surface exploration following the Apollo 13 accident.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69d6aafbb3c081908a9cdb4ecb8d981d |
elicitation | completed |
| NER | batch_69d8a260ab488190ab1c00d9850f3096 |
ner | completed |
| NED1 | batch_69f6554ec69c8190ba9ffbaf220c44f4 |
ned_source_triple | completed |
Created at: April 8, 2026, 9:39 p.m.