Triple

T11639320
Position Surface form Disambiguated ID Type / Status
Subject Port of Whittier E276617 entity
Predicate connectedBy P37 FINISHED
Object Anton Anderson Memorial Tunnel E641268 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Anton Anderson Memorial Tunnel | Statement: [Port of Whittier, connectedBy, Anton Anderson Memorial Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Anton Anderson Memorial Tunnel
Context triple: [Port of Whittier, connectedBy, Anton Anderson Memorial Tunnel]
  • A. Anton Anderson Memorial Tunnel chosen
    The Anton Anderson Memorial Tunnel is a combined rail and highway tunnel in Alaska that provides the only road access to the town of Whittier through the Chugach Mountains.
  • B. Homer Tunnel
    Homer Tunnel is a road tunnel in New Zealand’s Fiordland that provides critical access through the mountains on the route to Milford Sound.
  • C. Bosley Tunnel
    Bosley Tunnel is a historic narrowboat canal tunnel in Cheshire, England, forming part of the Macclesfield Canal navigation route.
  • D. Sumner Tunnel
    The Sumner Tunnel is a major vehicular tunnel in Boston that carries traffic under Boston Harbor between East Boston and downtown.
  • E. O'Neill Tunnel
    The O'Neill Tunnel is a major highway tunnel in downtown Boston that carries Interstate 93 beneath the city as part of the Big Dig project.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aafa51148190ab84940694c00235 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8a25e90c08190b7fb73939a2be3d7 completed April 10, 2026, 7:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69ee87d006e881908e008ffa17502d47 completed April 26, 2026, 9:46 p.m.
Created at: April 8, 2026, 9:39 p.m.