Triple
T11613506
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Balintawak Cloverleaf |
E275442
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | grade-separated interchange |
C3647
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: grade-separated interchange Context triple: [Balintawak Cloverleaf, instanceOf, grade-separated interchange]
-
A.
road junction
chosen
A road junction is a point where two or more roads meet or cross, allowing vehicles and pedestrians to change direction or route.
-
B.
elevated expressway
An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
-
C.
highway segment
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
D.
controlled-access highway
A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
-
E.
highway bridge
A highway bridge is a raised structure that carries vehicular traffic over obstacles such as rivers, valleys, other roads, or railways, ensuring continuous and efficient roadway connectivity.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaf84b548190ac072e4fb89ae18f |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:38 p.m.