Triple
T11612988
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Quezon Memorial Circle station (MRT-7) |
E275430
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned transport infrastructure |
C2489
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned transport infrastructure Context triple: [Quezon Memorial Circle station (MRT-7), instanceOf, planned transport infrastructure]
-
A.
planned transit corridor
A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
-
B.
public transportation infrastructure
chosen
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
C.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
D.
transport infrastructure agreement
A transport infrastructure agreement is a formal contract between parties that defines the responsibilities, funding, timelines, and performance standards for planning, building, operating, or maintaining transportation facilities such as roads, railways, ports, or airports.
-
E.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aaf84b548190ac072e4fb89ae18f |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:38 p.m.