Triple

T11611824
Position Surface form Disambiguated ID Type / Status
Subject Executive Order No. 1, series of 1986 E275401 entity
Predicate instanceOf P0 FINISHED
Object Philippine executive order C846 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Philippine executive order
Context triple: [Executive Order No. 1, series of 1986, instanceOf, Philippine executive order]
  • A. executive order chosen
    An executive order is a formal directive issued by a head of the executive branch, such as a president or governor, that manages operations of the government and has the force of law within the scope of existing statutory or constitutional authority.
  • B. major command of the Armed Forces of the Philippines
    A major command of the Armed Forces of the Philippines is a principal, large-scale organizational component responsible for directing, coordinating, and sustaining military operations and support functions within its designated domain (such as land, sea, air, or unified commands).
  • C. presidential proclamation
    A presidential proclamation is an official, formal public announcement issued by the President that declares, recognizes, or directs specific actions or observances under the authority of existing law or constitutional powers.
  • D. President of the Philippines
    The President of the Philippines is the head of state and government, chief executive, and commander-in-chief of the Armed Forces, responsible for leading the national administration and implementing laws and policies.
  • E. imperial edict
    An imperial edict is a formal, authoritative decree issued by an emperor that carries the force of supreme law within an empire.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf84b548190ac072e4fb89ae18f completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:38 p.m.