Triple

T11611586
Position Surface form Disambiguated ID Type / Status
Subject Pantawid Pamilyang Pilipino Program E275396 entity
Predicate instanceOf P0 FINISHED
Object poverty reduction program C86 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: poverty reduction program
Context triple: [Pantawid Pamilyang Pilipino Program, instanceOf, poverty reduction program]
  • A. economic aid program chosen
    An economic aid program is an organized initiative, typically funded by governments or international institutions, designed to provide financial resources, technical assistance, or policy support to stimulate economic development, stabilize economies, or alleviate poverty in targeted regions or populations.
  • B. public housing subsidy program
    A public housing subsidy program is a government initiative that provides financial assistance or reduced-cost housing to eligible low-income individuals and families to ensure access to safe, stable, and affordable homes.
  • C. policy program
    A policy program is a coordinated set of government or organizational initiatives, actions, and resources designed to achieve specific public or institutional goals through the implementation of formal policies.
  • D. regional development programme
    A regional development programme is a coordinated set of policies, investments, and initiatives designed to stimulate economic growth, improve infrastructure, and enhance social well-being within a specific geographic area.
  • E. economic transformation program
    An economic transformation program is a coordinated set of policies and initiatives designed to fundamentally restructure and modernize an economy to achieve sustainable, inclusive growth and increased competitiveness.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf84b548190ac072e4fb89ae18f completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:38 p.m.