Triple

T11604287
Position Surface form Disambiguated ID Type / Status
Subject Periyar River E275212 entity
Predicate hasHydroelectricProject P15311 FINISHED
Object Idamalayar Hydroelectric Project
Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
E936939 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Idamalayar Hydroelectric Project | Statement: [Periyar River, hasHydroelectricProject, Idamalayar Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Idamalayar Hydroelectric Project
Context triple: [Periyar River, hasHydroelectricProject, Idamalayar Hydroelectric Project]
  • A. Idukki Hydroelectric Project
    The Idukki Hydroelectric Project is a major hydroelectric power station in Kerala, India, known for its arch dam complex and significant contribution to the state's electricity supply.
  • B. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • C. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • D. Arun III Hydroelectric Project
    Arun III Hydroelectric Project is a major run-of-the-river hydropower plant under development in eastern Nepal, intended to generate electricity from the Arun River primarily for export to India and to support regional energy needs.
  • E. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Idamalayar Hydroelectric Project
Triple: [Periyar River, hasHydroelectricProject, Idamalayar Hydroelectric Project]
Generated description
Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Idamalayar Hydroelectric Project
Target entity description: Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
  • A. Idukki Hydroelectric Project
    The Idukki Hydroelectric Project is a major hydroelectric power station in Kerala, India, known for its arch dam complex and significant contribution to the state's electricity supply.
  • B. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • C. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • D. Arun III Hydroelectric Project
    Arun III Hydroelectric Project is a major run-of-the-river hydropower plant under development in eastern Nepal, intended to generate electricity from the Arun River primarily for export to India and to support regional energy needs.
  • E. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aaf84b548190ac072e4fb89ae18f completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d895502e0081909ee9c3d45d26cd91 completed April 10, 2026, 6:14 a.m.
NED1 Entity disambiguation (via context triple) batch_69ee87077d008190874a8339b64dd5ec completed April 26, 2026, 9:43 p.m.
NEDg Description generation batch_69ee9cf1cb2481908bc473c87bc42d60 completed April 26, 2026, 11:17 p.m.
NED2 Entity disambiguation (via description) batch_69eecd31894481908dbd55f605c693f9 completed April 27, 2026, 2:42 a.m.
Created at: April 8, 2026, 9:38 p.m.