Triple
T11582301
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mount Charlotte Reservoir |
E274657
|
entity |
| Predicate | connectedTo |
P37
|
FINISHED |
| Object |
Goldfields Water Supply Scheme pumping stations
The Goldfields Water Supply Scheme pumping stations are a series of historic facilities in Western Australia that pressurize and transport water along the long-distance pipeline from the coastal dams to the arid Eastern Goldfields region.
|
E934790
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Goldfields Water Supply Scheme pumping stations | Statement: [Mount Charlotte Reservoir, connectedTo, Goldfields Water Supply Scheme pumping stations]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Goldfields Water Supply Scheme pumping stations Context triple: [Mount Charlotte Reservoir, connectedTo, Goldfields Water Supply Scheme pumping stations]
-
A.
Jindabyne Pumping Station
Jindabyne Pumping Station is a hydroelectric facility in New South Wales, Australia, that forms part of the large-scale Snowy Mountains hydroelectric and irrigation network.
-
B.
Blowering Power Station
Blowering Power Station is a hydroelectric power facility in New South Wales, Australia, that forms part of the Snowy Mountains region’s renewable energy infrastructure.
-
C.
Chew Valley water supply system
The Chew Valley water supply system is an integrated network of reservoirs, treatment works, and pipelines in the Chew Valley area that provides potable water to surrounding communities.
-
D.
Ginninderra Creek dams
Ginninderra Creek dams are a series of water storage and management structures on Ginninderra Creek in the Australian Capital Territory, contributing to flood control, water supply, and environmental management within the Murrumbidgee River catchment.
-
E.
Snowy Hydro Scheme
The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Goldfields Water Supply Scheme pumping stations Triple: [Mount Charlotte Reservoir, connectedTo, Goldfields Water Supply Scheme pumping stations]
Generated description
The Goldfields Water Supply Scheme pumping stations are a series of historic facilities in Western Australia that pressurize and transport water along the long-distance pipeline from the coastal dams to the arid Eastern Goldfields region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Goldfields Water Supply Scheme pumping stations Target entity description: The Goldfields Water Supply Scheme pumping stations are a series of historic facilities in Western Australia that pressurize and transport water along the long-distance pipeline from the coastal dams to the arid Eastern Goldfields region.
-
A.
Jindabyne Pumping Station
Jindabyne Pumping Station is a hydroelectric facility in New South Wales, Australia, that forms part of the large-scale Snowy Mountains hydroelectric and irrigation network.
-
B.
Blowering Power Station
Blowering Power Station is a hydroelectric power facility in New South Wales, Australia, that forms part of the Snowy Mountains region’s renewable energy infrastructure.
-
C.
Chew Valley water supply system
The Chew Valley water supply system is an integrated network of reservoirs, treatment works, and pipelines in the Chew Valley area that provides potable water to surrounding communities.
-
D.
Ginninderra Creek dams
Ginninderra Creek dams are a series of water storage and management structures on Ginninderra Creek in the Australian Capital Territory, contributing to flood control, water supply, and environmental management within the Murrumbidgee River catchment.
-
E.
Snowy Hydro Scheme
The Snowy Hydro Scheme is a large-scale hydroelectricity and irrigation complex in Australia’s Snowy Mountains, renowned as one of the country’s most significant engineering projects.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aae5ac3c81908d2b0a3a665665b2 |
completed | April 8, 2026, 7:22 p.m. |
| NER | Named-entity recognition | batch_69d8904db5748190ae5f10ae86ccdf46 |
completed | April 10, 2026, 5:53 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e7141b16d8819099002a009260a85a |
completed | April 21, 2026, 6:07 a.m. |
| NEDg | Description generation | batch_69e720fb192881909c129f93c8b88f42 |
completed | April 21, 2026, 7:02 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69e7233efb6c81909dbf1aef080f5598 |
completed | April 21, 2026, 7:11 a.m. |
Created at: April 8, 2026, 9:38 p.m.