Triple
T11575293
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Beijing–Hong Kong (Taipei) high-speed rail corridor |
E274487
|
entity |
| Predicate | partOfPlan |
P29774
|
FINISHED |
| Object |
national medium- and long-term railway network plan of China
The national medium- and long-term railway network plan of China is a strategic blueprint that outlines the country’s long-range development of an extensive, integrated high-speed and conventional rail system connecting major regions and cities.
|
E270066
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: national medium- and long-term railway network plan of China | Statement: [Beijing–Hong Kong (Taipei) high-speed rail corridor, partOfPlan, national medium- and long-term railway network plan of China]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: national medium- and long-term railway network plan of China Context triple: [Beijing–Hong Kong (Taipei) high-speed rail corridor, partOfPlan, national medium- and long-term railway network plan of China]
-
A.
China High-Speed Rail Network
The China High-Speed Rail Network is an extensive, nationwide system of high-speed passenger rail lines that forms the backbone of modern rail transport across China.
-
B.
North–South high-speed railway (proposed)
The proposed North–South high-speed railway is a planned Vietnamese bullet train line intended to connect major cities from Hanoi to Ho Chi Minh City, significantly reducing travel time and modernizing the country’s transport infrastructure.
-
C.
Trans-China railway network
The Trans-China railway network is an extensive system of rail lines that links major Chinese ports, industrial centers, and inland regions, facilitating large-scale domestic and international freight and passenger transport across the country.
-
D.
Yangtze River Delta high-speed rail network
The Yangtze River Delta high-speed rail network is an extensive, densely interconnected high-speed railway system linking major cities across China’s economically vital Yangtze River Delta region.
-
E.
Northeast China rail network
The Northeast China rail network is a major railway system that connects key industrial cities and transport hubs across China’s northeastern region, serving as a crucial corridor for both passenger and freight traffic.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: national medium- and long-term railway network plan of China Triple: [Beijing–Hong Kong (Taipei) high-speed rail corridor, partOfPlan, national medium- and long-term railway network plan of China]
Generated description
The national medium- and long-term railway network plan of China is a strategic blueprint that outlines the country’s long-range development of an extensive, integrated high-speed and conventional rail system connecting major regions and cities.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: national medium- and long-term railway network plan of China Target entity description: The national medium- and long-term railway network plan of China is a strategic blueprint that outlines the country’s long-range development of an extensive, integrated high-speed and conventional rail system connecting major regions and cities.
-
A.
China High-Speed Rail Network
chosen
The China High-Speed Rail Network is an extensive, nationwide system of high-speed passenger rail lines that forms the backbone of modern rail transport across China.
-
B.
North–South high-speed railway (proposed)
The proposed North–South high-speed railway is a planned Vietnamese bullet train line intended to connect major cities from Hanoi to Ho Chi Minh City, significantly reducing travel time and modernizing the country’s transport infrastructure.
-
C.
Trans-China railway network
The Trans-China railway network is an extensive system of rail lines that links major Chinese ports, industrial centers, and inland regions, facilitating large-scale domestic and international freight and passenger transport across the country.
-
D.
Yangtze River Delta high-speed rail network
The Yangtze River Delta high-speed rail network is an extensive, densely interconnected high-speed railway system linking major cities across China’s economically vital Yangtze River Delta region.
-
E.
Northeast China rail network
The Northeast China rail network is a major railway system that connects key industrial cities and transport hubs across China’s northeastern region, serving as a crucial corridor for both passenger and freight traffic.
- F. None of above.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aae5ac3c81908d2b0a3a665665b2 |
completed | April 8, 2026, 7:22 p.m. |
| NER | Named-entity recognition | batch_69d89048120c81908258f984711f7dd4 |
completed | April 10, 2026, 5:53 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69e713e49f508190b9bad316d68eab42 |
completed | April 21, 2026, 6:06 a.m. |
| NEDg | Description generation | batch_69e720f9a8588190aa766d2e1628207a |
completed | April 21, 2026, 7:02 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69e72315dda08190996aa84587c5fc80 |
completed | April 21, 2026, 7:11 a.m. |
Created at: April 8, 2026, 9:38 p.m.