Triple

T11564779
Position Surface form Disambiguated ID Type / Status
Subject World Conference against Racism E274226 entity
Predicate adoptedKeyDocument P13720 FINISHED
Object Durban Declaration and Programme of Action E933717 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Durban Declaration and Programme of Action | Statement: [World Conference against Racism, adoptedKeyDocument, Durban Declaration and Programme of Action]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Durban Declaration and Programme of Action
Context triple: [World Conference against Racism, adoptedKeyDocument, Durban Declaration and Programme of Action]
  • A. Durban Declaration and Programme of Action chosen
    The Durban Declaration and Programme of Action is a comprehensive United Nations framework adopted in 2001 that outlines global commitments and measures to combat racism, racial discrimination, xenophobia, and related intolerance.
  • B. Vienna Declaration and Programme of Action
    The Vienna Declaration and Programme of Action is a landmark 1993 United Nations human rights document that reaffirmed the universality of human rights and set out a comprehensive framework for their promotion and protection worldwide.
  • C. Johannesburg Plan of Implementation
    The Johannesburg Plan of Implementation is a global action framework adopted at the 2002 World Summit on Sustainable Development to advance and operationalize international commitments on sustainable development and poverty eradication.
  • D. Beijing Declaration and Platform for Action
    The Beijing Declaration and Platform for Action is a landmark global policy framework adopted at the 1995 Fourth World Conference on Women that outlines comprehensive commitments to advance gender equality and women’s rights.
  • E. Cape Town Commitment
    The Cape Town Commitment is a major evangelical Christian document outlining theological convictions and a call to global mission, produced at the Third Lausanne Congress on World Evangelization in 2010.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: adoptedKeyDocument
Context triple: [World Conference against Racism, adoptedKeyDocument, Durban Declaration and Programme of Action]
  • A. adoptedDocument chosen
    Indicates that an authoritative body has formally approved and accepted a specific document as official or binding.
  • B. institutedByDocument
    Indicates that something (such as a rule, organization, or status) is formally established or created by a specific document.
  • C. adoptedPursuantTo
    Indicates that something (such as a measure, policy, or decision) was formally adopted in accordance with, and on the basis of, a specific legal authority, procedure, or instrument.
  • D. officialAdoptionBy
    Indicates that one entity has been formally and legally adopted or accepted as official by another entity or authority.
  • E. adopted
    Indicates that one entity has legally taken another (often a child or animal) into its family or care as a permanent member.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae5ac3c81908d2b0a3a665665b2 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d88dd321f88190a57ecaf079fbbc3f completed April 10, 2026, 5:42 a.m.
NED1 Entity disambiguation (via context triple) batch_69e713bcc0048190bec14ac4ab84d51d completed April 21, 2026, 6:05 a.m.
PD Predicate disambiguation batch_69d85dc3fc2c8190bed7e2111301a77c completed April 10, 2026, 2:17 a.m.
Created at: April 8, 2026, 9:37 p.m.