Triple

T11548386
Position Surface form Disambiguated ID Type / Status
Subject GSM-R E273829 entity
Predicate instanceOf P0 FINISHED
Object railway communication system C30219 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway communication system
Context triple: [GSM-R, instanceOf, railway communication system]
  • A. railway signaling system
    A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
  • B. train control system
    A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. railway coupling system
    A railway coupling system is a mechanical assembly that connects railway vehicles together, transmitting forces for traction and braking while maintaining alignment and safe separation between cars.
  • E. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae4dfa48190a3ab0b19a159a3c5 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:37 p.m.