Triple
T11548353
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CAF Beasain plant |
E273828
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway rolling stock manufacturing plant |
C6408
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway rolling stock manufacturing plant Context triple: [CAF Beasain plant, instanceOf, railway rolling stock manufacturing plant]
-
A.
rolling stock manufacturer
chosen
A rolling stock manufacturer is a company that designs, builds, and often maintains railway vehicles such as locomotives, passenger coaches, and freight wagons.
-
B.
rail transport manufacturer
A rail transport manufacturer is a company that designs, engineers, and produces railway vehicles and related equipment such as locomotives, passenger cars, freight wagons, and signaling systems.
-
C.
locomotive works
A locomotive works is an industrial facility where locomotives are designed, manufactured, assembled, repaired, and maintained.
-
D.
rolling stock platform
A rolling stock platform is a standardized interface or framework that defines the common design, components, and systems used across a family of railway vehicles to streamline development, maintenance, and operation.
-
E.
industrial railway
An industrial railway is a specialized rail system used within or between industrial facilities to transport raw materials, goods, and equipment efficiently as part of production and logistics operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aae4dfa48190a3ab0b19a159a3c5 |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:37 p.m.