Triple

T11480006
Position Surface form Disambiguated ID Type / Status
Subject Kuroshio limited express E272119 entity
Predicate terminus P388 FINISHED
Object Kyoto Station E54607 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kyoto Station | Statement: [Kuroshio limited express, terminus, Kyoto Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kyoto Station
Context triple: [Kuroshio limited express, terminus, Kyoto Station]
  • A. Kyoto Station chosen
    Kyoto Station is a major railway and transportation hub in Kyoto, Japan, known for its vast, modern architectural complex that integrates trains, buses, shopping, and cultural facilities.
  • B. Osaka Station
    Osaka Station is a major railway terminal and transportation hub in Osaka, Japan, serving numerous local and long-distance train lines and connecting key commercial districts.
  • C. Nagoya Station
    Nagoya Station is one of Japan’s largest and busiest railway hubs, serving as a major Shinkansen and regional transit center in the city of Nagoya.
  • D. Suita Station
    Suita Station is a railway station in Suita, Osaka Prefecture, Japan, serving passengers on the JR Kyoto Line (Tōkaidō Main Line).
  • E. Tokyo Station
    Tokyo Station is a major railway hub in central Tokyo, serving as a key terminal for Shinkansen bullet trains and numerous local and regional lines.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae0c8d881908a5a360c0be3242e completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8294f0e948190b2e106beb86e4b2c completed April 9, 2026, 10:33 p.m.
NED1 Entity disambiguation (via context triple) batch_69f5f62fa15081909e7c71d8feda7391 completed May 2, 2026, 1:03 p.m.
Created at: April 8, 2026, 9:36 p.m.