Triple

T11479997
Position Surface form Disambiguated ID Type / Status
Subject Kuroshio limited express E272119 entity
Predicate instanceOf P0 FINISHED
Object Japanese limited express train service C75 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Japanese limited express train service
Context triple: [Kuroshio limited express, instanceOf, Japanese limited express train service]
  • A. JR東日本の列車系統
    JR東日本の列車系統は、東日本旅客鉄道(JR東日本)が運行する在来線・新幹線などの各路線上で設定された運転系統やサービス区分を指し、列車の運行区間・種別・系統番号などによって利用者にわかりやすく整理・案内するための概念である。
  • B. mini-shinkansen line
    A mini-shinkansen line is a converted narrow-gauge railway upgraded to standard gauge and high-speed standards, allowing Shinkansen trains to run directly onto conventional lines while maintaining through-service with the main high-speed network.
  • C. high-speed rail service brand
    A high-speed rail service brand is a distinct identity and marketing concept that represents a specific provider’s fast, long-distance passenger train services, encompassing its name, visual design, service standards, and customer experience.
  • D. passenger rail service chosen
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • E. suburban commuter train
    A suburban commuter train is a passenger rail service designed to transport people efficiently between residential suburbs and urban centers, typically operating on fixed schedules with frequent stops during peak travel times.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aae0c8d881908a5a360c0be3242e completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:36 p.m.