Triple

T1147948
Position Surface form Disambiguated ID Type / Status
Subject PHX Sky Train E23609 entity
Predicate phaseOneRoute P21548 FINISHED
Object 44th Street/Washington station to Terminal 4 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 44th Street/Washington station to Terminal 4 | Statement: [PHX Sky Train, phaseOneRoute, 44th Street/Washington station to Terminal 4]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: phaseOneRoute
Context triple: [PHX Sky Train, phaseOneRoute, 44th Street/Washington station to Terminal 4]
  • A. parallelRoute
    Indicates that one route runs alongside and in the same general direction as another route without intersecting it.
  • B. firstRoutes chosen
    Indicates that one route or path is the initial or primary route taken or assigned among a set of possible routes.
  • C. primaryRoute
    Indicates that one route is designated as the main or preferred path among possible alternatives between locations.
  • D. nextRoute
    Indicates that one route directly follows another in a defined sequence or ordering of routes.
  • E. mainPhase
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493f0d32c8190ac74bad3c87f2641 completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4bd0bed00819091d71983d787a030 completed March 1, 2026, 10:26 p.m.
PD Predicate disambiguation batch_69a4bb4ee3988190ac89c5ae5b10e316 completed March 1, 2026, 10:18 p.m.
Created at: March 1, 2026, 7:44 p.m.