Triple

T11455404
Position Surface form Disambiguated ID Type / Status
Subject Dasu E271512 entity
Predicate hasMajorInfrastructureProjectNearby P79682 FINISHED
Object Dasu Hydropower Project E910622 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dasu Hydropower Project | Statement: [Dasu, hasMajorInfrastructureProjectNearby, Dasu Hydropower Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dasu Hydropower Project
Context triple: [Dasu, hasMajorInfrastructureProjectNearby, Dasu Hydropower Project]
  • A. Dasu Hydropower Project area chosen
    The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
  • B. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • C. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • D. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • E. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasMajorInfrastructureProjectNearby
Context triple: [Dasu, hasMajorInfrastructureProjectNearby, Dasu Hydropower Project]
  • A. infrastructureProjects
    Indicates that there are planned, ongoing, or completed construction or development works related to physical or organizational infrastructure involving the associated entities.
  • B. proposedInfrastructure
    Indicates that an infrastructure project or facility has been suggested or planned but not yet approved, built, or implemented between the related entities.
  • C. cityDuringConstruction
    Indicates that a city exists or is relevant during the time period in which a particular construction activity or project is taking place.
  • D. hasNearbyDevelopment chosen
    Indicates that a development or construction project exists in close physical proximity to the referenced entity.
  • E. hasNearbyCivicBuilding
    Indicates that one entity is located close to, or in the immediate vicinity of, a civic building such as a government, public service, or community facility.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aadff8888190a13f253f0d460874 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d822f2138081909408c7916cef99c9 completed April 9, 2026, 10:06 p.m.
NED1 Entity disambiguation (via context triple) batch_69e5d3e197c881909db2e4e59c61c3c3 completed April 20, 2026, 7:21 a.m.
PD Predicate disambiguation batch_69d80867ff248190bb157fa9e355353b completed April 9, 2026, 8:13 p.m.
Created at: April 8, 2026, 9:35 p.m.