Triple

T11454324
Position Surface form Disambiguated ID Type / Status
Subject Super Pit E271485 entity
Predicate instanceOf P0 FINISHED
Object open-cut gold mine C21456 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: open-cut gold mine
Context triple: [Super Pit, instanceOf, open-cut gold mine]
  • A. open-pit diamond mine
    An open-pit diamond mine is a large, terraced surface excavation where overburden and rock are removed in successive benches to expose and extract diamond-bearing ore.
  • B. open-pit copper mine
    An open-pit copper mine is a large-scale surface excavation where overburden and rock are removed in benches to access and extract copper-bearing ore using heavy machinery.
  • C. hard-rock mine
    A hard-rock mine is an underground or open-pit excavation where solid rock containing valuable minerals or metals is drilled, blasted, and processed for extraction.
  • D. gold mine chosen
    A gold mine is a site or operation where gold-bearing ore is extracted from the earth and processed to recover usable gold.
  • E. copper mine
    A copper mine is an industrial site where copper ore is extracted from the earth, processed, and refined for use in manufacturing and construction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aadff8888190a13f253f0d460874 completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:35 p.m.