Triple

T11452421
Position Surface form Disambiguated ID Type / Status
Subject Piute Dam E271433 entity
Predicate forms P2100 FINISHED
Object Piute Reservoir E271433 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Piute Reservoir | Statement: [Piute Dam, forms, Piute Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Piute Reservoir
Context triple: [Piute Dam, forms, Piute Reservoir]
  • A. Ochoco Reservoir
    Ochoco Reservoir is a man-made lake in central Oregon popular for fishing, boating, and outdoor recreation near the city of Prineville.
  • B. Piute Dam chosen
    Piute Dam is an irrigation and water storage structure on the Sevier River in south-central Utah, forming Piute Reservoir to support agriculture in the surrounding region.
  • C. Wickiup Reservoir
    Wickiup Reservoir is a large man-made lake in central Oregon known for its camping, boating, and especially trophy trout and kokanee fishing.
  • D. Piute Lake
    Piute Lake is a high-elevation alpine lake in California’s Sierra Nevada, popular with backpackers and anglers and often accessed via the Piute Pass trail.
  • E. Pueblo Reservoir
    Pueblo Reservoir is a large man-made lake in southern Colorado that serves as a key water supply, recreation area, and flood-control resource for the Pueblo region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aadff8888190a13f253f0d460874 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d81c6f4d788190ac59b0df946cebbc completed April 9, 2026, 9:38 p.m.
NED1 Entity disambiguation (via context triple) batch_69e5d3d740008190a05ccb789ac0906d completed April 20, 2026, 7:20 a.m.
Created at: April 8, 2026, 9:35 p.m.