Triple

T11444461
Position Surface form Disambiguated ID Type / Status
Subject NHDC Limited E271228 entity
Predicate parentOrganization P254 FINISHED
Object NHPC Limited E271230 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NHPC Limited | Statement: [NHDC Limited, parentOrganization, NHPC Limited]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NHPC Limited
Context triple: [NHDC Limited, parentOrganization, NHPC Limited]
  • A. NHPC Limited chosen
    NHPC Limited is an Indian government-owned hydropower company that develops, operates, and maintains large hydroelectric projects across the country.
  • B. NTPC Limited
    NTPC Limited is India’s largest state-owned power generation company, primarily engaged in producing and selling electricity from coal, gas, hydro, and renewable sources across the country.
  • C. L&T Power
    L&T Power is a business division of Larsen & Toubro that focuses on providing engineering, procurement, and construction solutions for power generation projects.
  • D. Reliance Power
    Reliance Power is an Indian power generation company, part of the Reliance Group, that develops and operates large-scale thermal and renewable energy projects across the country.
  • E. National Hydroelectric Power Corporation
    National Hydroelectric Power Corporation is an Indian government-owned enterprise responsible for developing, operating, and managing hydroelectric power projects across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aadff8888190a13f253f0d460874 completed April 8, 2026, 7:22 p.m.
NER Named-entity recognition batch_69d8088a66f48190b2b4a56cd62097cf completed April 9, 2026, 8:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69e5e8f8049881909c1a52101e4620b3 completed April 20, 2026, 8:51 a.m.
Created at: April 8, 2026, 9:35 p.m.