Triple
T11439753
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lionshead Village |
E271110
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | pedestrian village |
C30841
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: pedestrian village Context triple: [Lionshead Village, instanceOf, pedestrian village]
-
A.
tourist village
A tourist village is a small, purposefully developed settlement or area designed to accommodate and entertain visitors with lodging, amenities, and local cultural or recreational attractions.
-
B.
village center
A village center is the focal area of a rural community where key social, commercial, and civic activities are concentrated, often including shops, public spaces, and community facilities.
-
C.
cultural village
A cultural village is a community or attraction designed to preserve, showcase, and educate visitors about the traditional lifestyles, customs, architecture, and arts of a particular culture or ethnic group.
-
D.
village complex
A village complex is a clustered arrangement of residential, communal, and support structures that together form the functional and social core of a small rural settlement.
-
E.
traditional village
A traditional village is a small, close-knit rural settlement characterized by long-established customs, locally sourced architecture, and community-based ways of life often centered around agriculture or artisanal trades.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aadeef688190874bcecd88b3dd9b |
completed | April 8, 2026, 7:22 p.m. |
Created at: April 8, 2026, 9:35 p.m.