Triple

T11428374
Position Surface form Disambiguated ID Type / Status
Subject FlixBus E270812 entity
Predicate instanceOf P0 FINISHED
Object long-distance bus company C4916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-distance bus company
Context triple: [FlixBus, instanceOf, long-distance bus company]
  • A. transportation services company chosen
    A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
  • B. touring company
    A touring company is an organization that plans, manages, and presents performances or events in multiple locations, often traveling with a cast, crew, and equipment to different venues.
  • C. rail transport company
    A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
  • D. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • E. private railway company
    A private railway company is a non-governmental business entity that owns, operates, or manages rail transport services for passengers and/or freight, typically for profit under regulatory oversight.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aadeef688190874bcecd88b3dd9b completed April 8, 2026, 7:22 p.m.
Created at: April 8, 2026, 9:35 p.m.