Triple

T11402721
Position Surface form Disambiguated ID Type / Status
Subject Memorial Stadium (Bremerton) E270155 entity
Predicate city P40 FINISHED
Object Bremerton E50019 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bremerton | Statement: [Memorial Stadium (Bremerton), city, Bremerton]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bremerton
Context triple: [Memorial Stadium (Bremerton), city, Bremerton]
  • A. Bremerton chosen
    Bremerton is a waterfront city in Washington State known for its naval shipyard and ferry connection to Seattle across Puget Sound.
  • B. Seattle–Bremerton
    Seattle–Bremerton is a major Washington State ferry route across Puget Sound that connects the city of Seattle with the city of Bremerton on the Kitsap Peninsula.
  • C. Gig Harbor
    Gig Harbor is a picturesque waterfront city in western Washington known for its maritime heritage, marinas, and views of Mount Rainier.
  • D. Long Beach, Washington
    Long Beach, Washington is a small coastal city on the Long Beach Peninsula known for its expansive sandy beach, tourism, and seaside attractions.
  • E. Port Orchard
    Port Orchard is a small waterfront city in Washington State known as the administrative and commercial hub of Kitsap County.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aacdbc6c8190af6dc3d5f5d22836 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d8014ab46881909fa1d425926c617b completed April 9, 2026, 7:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69f470faab4c8190ac9091713080dc7a completed May 1, 2026, 9:23 a.m.
Created at: April 8, 2026, 9:34 p.m.