Triple
T11399353
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CTCS-3 |
E270065
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Chinese Train Control System level |
C3559
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Chinese Train Control System level Context triple: [CTCS-3, instanceOf, Chinese Train Control System level]
-
A.
train control system
A train control system is a coordinated set of hardware and software components that monitor, regulate, and automate train movements to ensure safe, efficient, and reliable railway operations.
-
B.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
C.
railway signaling system
chosen
A railway signaling system is an integrated set of trackside and onboard equipment, rules, and communication protocols that control train movements to ensure safe separation, efficient routing, and protection against collisions.
-
D.
third rail electrification system
A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
-
E.
named train
A named train is a specific passenger rail service distinguished by a unique name, branding, and often a consistent route and schedule.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aacdbc6c8190af6dc3d5f5d22836 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:34 p.m.