Triple
T11395645
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dalton Plan |
E269966
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | progressive education method |
C4871
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: progressive education method Context triple: [Dalton Plan, instanceOf, progressive education method]
-
A.
pedagogical method
chosen
A pedagogical method is a structured approach or strategy used by educators to facilitate learning, guide instruction, and support students in achieving specific educational goals.
-
B.
educational movement
An educational movement is a coordinated effort by individuals or groups to reform, innovate, or transform teaching and learning practices, policies, or philosophies within an educational system or society.
-
C.
progressive
Progressive: A conceptual class representing continuous advancement or development over time, often characterized by gradual improvement, innovation, or forward-thinking change.
-
D.
educational program
An educational program is an organized set of learning experiences, courses, and activities designed to achieve specific educational goals and outcomes for a defined group of learners.
-
E.
educational journey
An educational journey is the evolving, lifelong process through which an individual acquires knowledge, skills, and personal growth across diverse learning experiences and environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aacdbc6c8190af6dc3d5f5d22836 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:34 p.m.