Triple

T11361512
Position Surface form Disambiguated ID Type / Status
Subject Errol Morris E269095 entity
Predicate directed P7373 FINISHED
Object Standard Operating Procedure E921355 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Standard Operating Procedure | Statement: [Errol Morris, directed, Standard Operating Procedure]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Standard Operating Procedure
Context triple: [Errol Morris, directed, Standard Operating Procedure]
  • A. Standard Operating Procedure chosen
    Standard Operating Procedure is a 2008 documentary film by Errol Morris that examines the infamous prisoner abuse scandal at Abu Ghraib prison during the Iraq War.
  • B. SOP
    SOP is the Polish State Protection Service, a government agency responsible for protecting top state officials and key national facilities.
  • C. SOP
    SOP is the National Rail station code for Southport railway station in Merseyside, England.
  • D. Standards and Recommended Practices
    Standards and Recommended Practices are internationally agreed technical and operational specifications issued by the International Civil Aviation Organization to harmonize and enhance the safety, efficiency, and regularity of global civil aviation.
  • E. NomCom Operating Procedures
    NomCom Operating Procedures are the formal rules and guidelines that define how the Nominating Committee conducts its selection and decision-making processes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6aacbe18081909e5fadb50082dd96 completed April 8, 2026, 7:21 p.m.
NER Named-entity recognition batch_69d7ea442e5c8190babfde25540b27e9 completed April 9, 2026, 6:04 p.m.
NED1 Entity disambiguation (via context triple) batch_69e58bb3bd648190affa7ee85027c958 completed April 20, 2026, 2:13 a.m.
Created at: April 8, 2026, 9:33 p.m.