Triple
T11359414
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paerdegat Basin Combined Sewer Overflow Facility |
E269044
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wastewater management facility |
C18666
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wastewater management facility Context triple: [Paerdegat Basin Combined Sewer Overflow Facility, instanceOf, wastewater management facility]
-
A.
wastewater treatment facility
chosen
A wastewater treatment facility is an engineered system that collects, treats, and purifies sewage and industrial effluent to remove contaminants before safely returning the water to the environment or reusing it.
-
B.
municipal water supply facility
A municipal water supply facility is an infrastructure complex that sources, treats, stores, and distributes potable water to meet the needs of a community or city.
-
C.
radioactive waste processing facility
A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
-
D.
water management structure
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
-
E.
flood control facility
A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6aacbe18081909e5fadb50082dd96 |
completed | April 8, 2026, 7:21 p.m. |
Created at: April 8, 2026, 9:33 p.m.